How a build runs on QSME

Pick a build and scroll. Every stage on site is matched with what you do in QSME at that point, from the first address search to the Code Compliance Certificate.

Start free

Search the address

Type the address. QSME pulls the parcel, zone, services and hazards from LINZ and council data, so you know what the section can take before you spend a dollar.

On site: survey pegs

Price it from the drawings

Upload the consent pack. QSME reads every sheet into a schedule of quantities you check line by line, and flags what the drawings leave out.

On site: groundworks

Put it out to tender

Send the same scope to the trades you choose, or to the whole country. Every quote lands on the same lines, so you compare them in one table.

On site: foundations

Award it and sign the agreement

Award the bid and the agreement is drafted from it. Both sides sign in the app, with the schedule of payments attached.

On site: structure

Run the schedule

A programme that moves the rest of the job when one trade slips, and tells the affected tradies it moved.

On site: lock-up

Claims, payments and the site diary

Milestone claims come off the work already recorded. Inductions, inspections and the daily log sit on the same timeline.

On site: fit-out

CCC and the full record

Code Compliance issued, and every drawing, variation, certificate and payment handed over as one record.

On site: handover

Your next project starts
before the first nail.

Free to join. Bring a site, an idea or a set of drawings — and deliver the whole project with the right people beside you.